Heathkit Model OP-1
Professional Oscilloscope
Date Calibrated: _____/_____/_____
Calibration Procedure
· Disconnect all external cables, components, and wires from the output terminals.
· All controls and switches are described as labeled on either the instrument or the schematic diagram.
Ancillary Equipment Needed
1 MHz Square Wave Generator
Audio Generator
Frequency Counter
VTVM
* * * * * * *
TUBE REMOVAL SETUP
Refer to top illustration
Operation Manual, page 28
( ) Remove the 12BH7 tube from socket V-4.
( ) Remove the 12BH7 tube from socket V-16.
( ) Remove the OB2 tube from socket V-10.
* * * * * * *
FRONT PANEL INITIAL SETUP
Refer to photo
Operation Manual, page 15
( ) Adjust both the INTENSITY and SCALE ILLUMINATION controls (R71 & R54) to the center of rotation.
( ) Adjust both the FOCUS and ASTIGMATISM controls (R73 & R77) to the center of rotation.
( ) Adjust both the VERTICAL CENTERING and HORIZONTAL CENTERING controls (R13 & R48) to the center of rotation.
( ) Adjust the VERTICAL GAIN control (R7) to full counter-clockwise.
( ) Set the TRIGGER SELECTOR switch to the HIGH FREQ position.
( ) Adjust the STABILITY control (R35) to full counter-clockwise.
( ) Set the horizontal TRIGGER SELECTOR switch to the HOR INPUT position.
( ) Adjust the TRIGGERING LEVEL control (R24) to full counter-clockwise.
( ) Set the vertical AC-DC switch to the DC position.
( ) Set the VERTICAL ATTENUATOR switch to the 50 volts/cm position.
( ) Adjust the VARIABLE MULTIPLIER control (R38) to the 5 position.
( ) Set the STABILITY CONTROL switch to the 2 ms/cm position.
( ) Turn the PHASING control (R42) counter-clockwise to the AC OFF position.
( ) Set the HORIZONTAL MULTIPLIER switch to the 1 DC position.
( ) Adjust the HORIZONTAL GAIN control (R51) to full counter-clockwise.
( )? Adjust the vertical DC BALANCE control (R6) – position unimportant.
( )? Adjust the horizontal DC BALANCE control (R46) – position unimportant.
* * * * * * *
INTERNAL INITIAL SETUP
Bottom chassis plate [top photo]
Operation Manual, page 16
( ) Adjust the H. V. ADJUST control (R69) to the center of rotation.
( ) Adjust the AC TRIGGER ADJUST control (R26) to the center of rotation.
( ) Adjust the TRIGGER SENSITIVITY control (R27) to the center of rotation.
( ) Adjust the SWEEP CALIBRATION control (R41) to the center of rotation.
( ) Adjust the SWEEP RANGE control (R40) to the center of rotation.
( )? Adjust the SWEEP POSITIONING control (R68) – position unimportant.
( )? Adjust the HIGH FREQUENCY SWEEP ADJUST trimmer (C26) [behind front panel] – position unimportant.
* * * * * * *
Vertical Amp Setup
Left side of chassis [bottom photo]
Operation Manual, page 16
( ) Adjust the VERTICAL RANGE control (R11) to the center of rotation.
( )? Adjust the vertical HIGH FREQUENCY trimmer (C102) – position unimportant.
( )? Adjust the vertical COMPENSATION trimmers (C2 & C3) – position unimportant.
* * * * * * *
Calibration Start
( ) Connect the line cord to the AC power lines.
( ) Turn the PHASING control clockwise to the ON position.
(Allow the instrument to warm up for 15 minutes)
( ) Adjust the INTENSITY control until the spot is just visible.
( ) Voltage Regulator tubes V17, V18, V19, V21, & V22 should be glowing.
( ) Neon bulb (V23) [left side of chassis] should be lit.
* * * * * * *
DC Balance Adjustments
Front Panel
( ) Connect the VTVM’s common lead to the chassis.
( ) Set the VTVM function switch to the DC+ position.
( ) Set the VTVM’s range switch to the 150-volts scale position.
( ) Connect the VTVM’s test probe to the center lug of the vertical DC BALANCE control (R6) [front panel].
( ) Adjust the DC BALANCE control until a reading of 0 volts is obtained.
· Decrement the meter’s range switch as the voltage decreases.
( ) Disconnect the test probe.
( ) Set the VTVM’s range switch to the 150-volts scale position.
( ) Connect the VTVM’s test probe to the center lug of the horizontal DC BALANCE control (R46) [front panel].
( ) Adjust the DC BALANCE control until a reading of 0 volts is obtained.
· Decrement the meter’s range switch as the voltage decreases.
( ) Disconnect the test probe.
* * * * * * *
Sweep Positioning Adjustment
Bottom chassis plate [top photo]
Operation Manual, page 16
( ) Set the VTVM’s range switch to the 150-volts scale position.
( ) Connect the VTVM’s test probe to the center lug of the SWEEP POSITIONING control (R68).
( ) Adjust the SWEEP POSITIONING control until a reading of 0 volts is obtained.
· Decrement the meter’s range switch as the voltage decreases.
( ) Disconnect the test probe.
* * * * * * *
Tube Installation
Refer to top illustration
Operation Manual, page 28
( ) Turn the PHASING control counter-clockwise to the AC OFF position.
( ) Install a 12BH7 tube into socket V-4.
( ) Install a 12BH7 tube into socket V-16.
( ) Install an OB2 tube into socket V-10.
* * * * * * *
Trace Adjustment
( ) Turn the PHASING control clockwise to the ON position.
(Allow the instrument to warm up for 5 minutes)
( ) Adjust the VERTICAL RANGE control (R11) [left side of chassis] until the spot is in the middle of the display.
( ) Adjust both the FOCUS and ASTIGMATISM controls (R73 & R77) for the smallest spot size.
( ) Adjust the INTENSITY control (R71) until the spot is just visible.
( ) Adjust the HORIZONTAL GAIN control (R51) to full clockwise.
( ) Connect a test lead to the horizontal input binding post.
( ) Connect the same test lead to either pin 3 or 4 of the 6C4 tube (V-14).
( ) A horizontal trace should appear.
( ) Horizontal trace should be parallel with the horizontal graticule lines.
( ) If trace is parallel with graticule lines, skip down to next double asterisk marked instruction.
( )1 Note the relative position of the trace.
( )2 Turn the PHASING control counter-clockwise to the AC OFF position.
( )3 Loosen the CRT clamps.
( )4 Rotate the CRT tube until the trace is parallel with the graticule lines.
( )5 Tighten the CRT clamps.
( )6 Turn the PHASING control clockwise to the ON position.
(Allow the instrument to warm up for 5 minutes)
· Repeat the above six steps * until the trace is parallel with the graticule lines.
( )** Disconnect the test lead from both the 6C4 tube and the binding post.
* * * * * * *
Horizontal Sweep Adjustment
( ) Adjust the HORIZONTAL GAIN control (R51) to full counter-clockwise.
( ) Note the position of the spot.
( ) Adjust the HORIZONTAL GAIN control to full clockwise.
( ) If the spot moved, adjust the horizontal DC BALANCE control (R46) until the spot returns to its original position.
( ) Set the horizontal TRIGGERING LEVEL switch to the INT – position.
( ) Adjust the STABILITY control (R35) to full clockwise.
( ) A horizontal trace should appear.
( ) Adjust the HORIZONTAL CENTERING control (R48) to center the trace.
( ) Adjust the HORIZONTAL GAIN control (R51) until the trace is 10 cm long [full screen width].
( ) Set the HORIZONTAL MULTIPLIER switch to the 5 DC position.
( ) Adjust the HORIZONTAL CENTERING control (R48) from full clockwise to full counter-clockwise.
( ) If the entire trace can be centered, skip down to next double asterisk ** marked instruction.
( ) Adjust the HORIZONTAL CENTERING control to the center of rotation.
( ) Adjust the SWEEP POSITIONING control (R68) [bottom chassis plate] until the trace is centered.
( )** Adjust the vertical DC BALANCE control (R6) as described in the DC Balance Adjustments section above.
* * * * * * *
Vertical Gain Adjustment
( ) Adjust the VERTICAL GAIN control (R7) to full counter-clockwise.
( ) Note the trace position.
( ) Adjust the VERTICAL GAIN control to full clockwise.
( ) If the trace has moved, adjust the vertical DC BALANCE control (R6) until the trace is at its noted position above.
* * * * * * *
Internal Trigger Sweep Adjustment
( ) Set the TRIGGER SELECTOR switch to the DC position.
( ) Adjust the STABILITY control (R35) to full counter-clockwise.
( ) Adjust the TRIGGERING LEVEL control (R24) to full counter-clockwise.
( ) Adjust the STABILITY control clockwise until a trace appears.
( ) Adjust the STABILITY control counter-clockwise until the trace just disappears.
· DO NOT readjust the STABILITY control unless instructed to do so.
( )1 Adjust the TRIGGERING LEVEL control (R24) clockwise until a trace just appears.
( )2 Adjust the TRIGGER SENSITIVITY control (R27) [bottom chassis plate] clockwise until the trace just disappears.
( ) Repeat the above two steps * until no continuous trace occurs at any setting of the TRIGGERING LEVEL control (R24).
* * * * * * *
Vertical Triggering Level Adjustment
( ) Connect a test lead to the vertical input.
( ) Connect the same test lead to either pin 3 or 4 of the 6C4 tube (V-2).
( ) Set the VERTICAL ATTENUATOR switch to the 2 volts/cm position.
( ) Adjust the VERTICAL GAIN control (R7) for a trace 3 – 4 cm high.
( ) Adjust the TRIGGERING LEVEL control (R24) until a trace appears.
· Rotation of the Triggering Level control changes the start position of the trace.
( ) Set the TRIGGER SELECTOR switch to the AC position.
( ) Adjust the AC TRIGGER ADJUST control (R26) [bottom chassis plate] until the trace just appears and the starting point (left edge) is exactly the same spot before in the DC switch position.
· This adjustment is sensitive, until the control is properly adjusted, no trace will be present.
( ) Set the horizontal TRIGGER SELECTOR switch to the INT + position.
( ) Adjust the TRIGGERING LEVEL control (R24) until a trace appears.
· Operation should be exactly the same as in the INT – position, except for a start slope change.
( ) Disconnect the test lead from the 6C4 tube only.
* * * * * * *
External Triggering Adjustment
( ) Set the horizontal TRIGGERING SELECTOR switch to the EXT TRIGGER – position.
( ) Connect the same test lead to the EXT TRIGGER input [front panel].
· The operation of the STABILITY control (R35) and the TRIGGERING LEVEL control (R24) remain the same.
( ) Disconnect the test lead from both the vertical and EXT TRIGGER inputs.
* * * * * * *
Trigger Sensitivity Adjustment
( ) Set the TRIGGER SELECTOR switch to the AC AUTO position.
· If no trace is present, skip the next step.
( ) Adjust the TRIGGER SENSITIVITY control (R27) [bottom chassis plate] clockwise until the trace just disappears.
( ) Adjust the TRIGGER SENSITIVITY control counter-clockwise until the trace just appears.
* * * * * * *
Vertical Input Calibration
( ) Set the TRIGGER SELECTOR switch to the AC AUTO position.
( ) Remove the knob on the VERTICAL GAIN control (R7).
( ) Set the VERTICAL ATTENUATOR switch to the 50 volts/cm position.
( ) Connect a test lead to the vertical input.
( ) Connect the same test lead to the 150 VDC FOR CAL output [front panel].
( ) Set the vertical AC-DC switch to the DC position.
( ) Adjust the VERTICAL GAIN control (R7) to full counter-clockwise.
( ) Adjust the VERTICAL CENTERING control (R13) until the trace is centered on the graticule grid.
( ) Adjust the VERTICAL GAIN control (R7) clockwise until the trace moves up 3 cm.
( ) Re-install the Vertical Gain knob with the pointer indexed on the red dot on the front panel [to the right of the control].
( ) Adjust the VERTICAL GAIN control (R7) to full counter-clockwise.
( ) Set the VERTICAL ATTENUATOR switch to the 20 volts/cm position.
( ) Adjust the VERTICAL CENTERING control (R13) until the trace is on the bottom base line of the graticule grid.
( ) Adjust the VERTICAL GAIN control (R7) clockwise to the red dot.
( ) The trace should move upward approximately 7-1/2 cm.
( ) Adjust the INTENSITY controls (R71) to full counter-clockwise.
( ) Adjust the H. V. ADJUST control (R69) [bottom chassis plate] until the trace disappears.
( ) Disconnect the test lead from both the vertical input and the 150 VDC CAL output.
* * * * * * *
Sweep Calibration
( ) Set the SWEEP FREQUENCY switch to the .2 ms/cm position.
( ) Adjust the VARIABLE MULTIPLIER control (R38) to the 1 position.
( ) Connect the Frequency Counter input and the square wave output of the Audio Generator together using RG59 coax cables and a BNC T-adapter.
( ) Adjust the Audio Generator for a frequency of 1 kHz.
( ) Connect the T-adapter to the vertical input using a UHF-BNC adapter.
( ) Adjust the SWEEP CALIBRATION control (R41) [bottom chassis plate] until 2 complete cycles are present on the display.
( ) Adjust the VARIABLE MULTIPLIER control (R38) to the 10 position.
( ) Adjust the SWEEP RANGE control (R40) [bottom chassis plate] until 20 complete cycles are present on the display.
( ) Set the SWEEP FREQUENCY switch to the .1 ms/cm position.
( ) Adjust the Audio Generator for a frequency of 50 kHz.
( ) Adjust the HIGH FREQUENCY SWEEP ADJUST trimmer (C26) [behind front panel] until 2 complete cycles are present on the display.
( ) Disconnect the Audio Generator only from the T-adapter.
* * * * * * *
Vertical High Frequency Compensation
Refer to bottom photo
Operation Manual, page 16
( ) Set the VERTICAL ATTENUATOR switch to the .1 volts/cm position.
( ) Connect a RG59 coax cable from the 1 MHz square wave generator to the T-adapter.
( ) Adjust the VERTICAL HIGH FREQUENCY trimmer (C102) [left side of chassis] for a sharp squared off corner trace.
( ) Disconnect the T-adapter and UHF-BNC adapter from the vertical input.
* * * * * * *
Vertical Attenuator Trimmers
Refer to bottom photo
Operation Manual, page 16
( ) Set the VERTICAL ATTENUATOR switch to the 1 volt/cm position.
( ) Set the SWEEP FREQUENCY switch to the .2 ms/cm position.
( ) Adjust the STABILITY control (R35) to full clockwise.
( ) Connect a test lead to the vertical input.
( ) Connect the same test lead to the center lug of the HORIZONTAL GAIN control (R51).
( ) Adjust both the HORIZONTAL GAIN control (R51) and the VERTICAL GAIN control (R7) until a diagonal trace is displayed. [Refer to diagram J, Operation Manual, page 20]
( ) Adjust input trimmer (C2) [nearest front panel] until the straightest diagonal trace is displayed.
( ) Turn the PHASING control (R42) counter-clockwise to the AC OFF position.
( ) Disconnect the test lead from the HORIZONTAL GAIN control.
( ) Connect the same test lead to the 12BH7 tube socket pin 1 (V-16).
( ) Turn the PHASING control (R42) counter-clockwise to the ON position.
(Allow the instrument to warm up for 5 minutes)
( ) Adjust both the HORIZONTAL GAIN control (R51) and the VERTICAL GAIN control (R7) until a diagonal trace is displayed. [Refer to diagram K, Operation Manual, page 20]
( ) Adjust input trimmer (C3) [next to trimmer C2] until the straightest diagonal trace is displayed.
( ) Turn the PHASING control (R42) counter-clockwise to the AC OFF position.
( ) Disconnect all test leads from the instrument.
( ) Disconnect the line cord from the AC power line.
( ) Calibration procedure is complete.